What volume of water is to be processed?: 8 acre ft/day, 2.6 mil. gallons/day,
10,000 cubic mters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : 1/16 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Sydney Richards
company: Pinnacle Resources Inc
address: 404 - 2222 Prince Edward Vancouver
state: British Columbia
country: Canada
phone: 604 - 872-1752
fax: 604 - 872-1782
email: pinnacle@dowco.com
webaddress: in process of construction
timezone: pacific
B1: Submit
Date: 11/23/98
Time: 3:10:54 AM
Remote Name: 207.23.88.150
Remote User:
HTTP User Agent: Mozilla/2.0 (compatible; MSIE 3.01; Windows 95)
What is your time line to bring a new system online?
12 to 18 months from January 1 1999
other
What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/2 mile
distanceother:
D1How far from the main interconnect to move the product : 1/2 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: electric
energyother:
name: Sam Humphrey
company: C M V C
address: P.O. Box 9462
state: Paducah, Ky 42002-9462
country: usa
phone: 502-442-3177
fax:
email: none avail until 12/15/98
webaddress:
timezone: cst
B1: Submit
Date: 12/9/98
Time: 2:47:17 PM
Remote Name: 208.141.41.33
Remote User:
HTTP User Agent: Mozilla/2.0 (compatible; MSIE 3.02; Update a; Windows 95)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 8 acre ft/day, 2.6 mil. gallons/day,
10,000 cubic mters/day
Volumeother:
What is the source of water? : click arrow
ppmother: water mixed with oil and olive residues
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/16th mile
distanceother:
D1How far from the main interconnect to move the product : 1/16 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Antonio Lara
company: TRAINALBA, S.L.
address:
state:
country: SPAIN
phone:
fax:
email: lara@dali.eis.uva.es
webaddress:
timezone:
B1: Submit
Date: 2/4/99
Time: 1:11:42 PM
Remote Name: 157.88.143.21
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.0; Windows NT)
What is your time line to bring a new system online?
5 months
other
What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/4 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: click arrow
returnother: return to sea
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: GEORGIOS DEMETRIOU
company: TECHNICAL INST
address:
state:
country: CYPRUS
phone:
fax:
email: DIMIS12@HOTMAIL.COM
webaddress:
timezone:
B1: Submit
Date: 3/12/99
Time: 6:05:13 AM
Remote Name: 152.66.114.80
Remote User:
HTTP User Agent: Mozilla/4.07 [hu] (Win95; I)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/4 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother: return to sea
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: GEORGIOS DEMETRIOU
company: TECHNICAL INST
address:
state:
country: CYPRUS
phone:
fax:
email: DIMIS12@HOTMAIL.COM
webaddress:
timezone:
B1: Submit
Date: 3/12/99
Time: 6:08:13 AM
Remote Name: 152.66.114.80
Remote User:
HTTP User Agent: Mozilla/4.07 [hu] (Win95; I)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: click arrow
Volumeother:
What is the source of water? : click arrow
ppmother:
What purity of water is desired?: click arrow
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: click arrow
distanceother:
D1How far from the main interconnect to move the product : click arrow
interconnectother:
Height of installation site above water level? : click arrow
heightother:
Where will the return line empty?: click arrow
returnother:
What is source of capitol for construction? : click arrow
capitolother:
energy: click arrow
energyother:
name: Mark Toner
company:
address:
state:
country: Scotland
phone:
fax:
email: mark.toner@strath.ac.uk
webaddress:
timezone:
B1: Submit
Date: 3/17/99
Time: 4:14:50 AM
Remote Name: 130.159.248.35
Remote User:
HTTP User Agent: Mozilla/4.03 [en] (WinNT; I ;Nav)
What is your time line to bring a new system online?
other
Dear Sir/madam, I am a student currently studying chemical engineering at Strathclyde
University.It would help me a great deal if you could send me information on safety,
economics, flowsheets, environment and details on all methods of desalination. Yours
sincerely, Mark Toner
What volume of water is to be processed?: click arrow
Volumeother: 500 cubic m/day
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/4 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: thomas
company:
address:
state:
country: greece
phone:
fax:
email: birbirikos@yahoo.com
webaddress:
timezone:
B1: Submit
Date: 3/18/99
Time: 6:06:41 AM
Remote Name: 155.207.20.122
Remote User:
HTTP User Agent: Mozilla/4.06 [en] (Win98; I)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 16 acre ft/day, 5.2 gallons/day,
20,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th mile
distanceother:
D1How far from the main interconnect to move the product : 1/16 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: Alex Oliveira
company: Personal use only........!
address: Apartado 355
state: Merida
country: Venezuela
phone: +5874-440092
fax:
email: aoliveir@telcel.net.ve
webaddress:
timezone:
B1: Submit
Date: 3/20/99
Time: 1:59:13 PM
Remote Name: 206.49.132.136
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows 98; Speed)
What is your time line to bring a new system online?
Information Request only
other
volume: 4 acre ft/day, 1.3 mil. gallons/day, 5,000 cubic meters/day
Volumeother:
type: seawater, Reverse Osmosis
ppmother:
purity: 100-200 parts per million
ppmoutother:
D3: 15,000 sq.-ft. min --- 4 acre ft./day plant
T3: not limited
distance: 1/16th mile
distanceother: 2.5km
D1: 1/16 mile
T1: 0
height: 200-300 ft
heightother: +-230ft
return: Return to ocean
returnother:
D2: Private
T2:
energy: Co-generation
energyother:
yes:
no: ON
typeother:
name: Arthur A. Götz
company: A C & V (Pty) Ltd.
address: P. O. Box 9274
state: Windhoek
country: Namibia
phone: 09264 - 61 - 262 941
fax: 09264 - 61 - 262130
email: acpluv@iafrica.com.na
webaddress: -
timezone:
B1: Submit
Date: 3/28/99
Time: 8:45:31 AM
Remote Name: 196.20.4.67
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; MSN 2.5; Windows 98)
likesdislikes
reasonforchange
future
replace
timeline
Project investigation only
other
What volume of water is to be processed?: 16 acre ft/day, 5.2 gallons/day,
20,000 cubic meters/day
Volumeother:
What is the source of water? : click arrow
ppmother: sea water 35000PPM
What purity of water is desired?: 100-200 parts per million
ppmoutother: and high purity less than 1 ppm
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other: In the site for a power plant
How close to the water source will the plant be placed?: 1/16th mile
distanceother: Arrangements for drawing sea water planned
D1How far from the main interconnect to move the product : 1 mile
interconnectother: For use in power plant services, cooling tower makeup and boiler
feed
Height of installation site above water level? : 0-100 ft
heightother: almost along the coast line
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother: Debt Equity 3:1
energy: Co-generation
energyother: this deslination will be part of the power plant with 750 MW capacity
name: C.Radhakrishnan
company: Banpu Public Company Ltd, 25-28 Floor, Grand Amarin Tower,
address: 1550 New Petchburi Road, Ratchathewi, Bangkok 10310
state: Bangkok
country: Thailand
phone: (66) 2 2070730
fax: (66) 2 2070698
email: radha_c@banpu.co.th
webaddress:
timezone: 7 hours ahead of GMT
B1: Submit
Date: 4/1/99
Time: 1:14:02 AM
Remote Name: 202.59.252.134
Remote User:
HTTP User Agent: Mozilla/4.06 [en] (Win95; I)
What is your time line to bring a new system online?
Depending on arranging funds through fund managers, including deatiled engineering
procurement and construction - 30 months
other
This a new power plant under IPP program of the Governement, with allapprovals from
local authoriies in hand
What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th mile
distanceother:
D1How far from the main interconnect to move the product : 1/8 mile
interconnectother:
Height of installation site above water level? : 100-200 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: ZAID ALDHAFEERI
company: S.W.C.C
address: P.O BOX 146 ALKHAFJI CITY 31971
state: EASTREN
country: SAUDIA ARABIA
phone: 669-03-7660009
fax:
email: AA@COM
webaddress:
timezone:
B1: Submit
Date: 6/1/99
Time: 3:59:08 PM
Remote Name: 195.226.255.228
Remote User:
HTTP User Agent: Mozilla/4.05 [en] (Win95; I)
What is your time line to bring a new system online?
GAS
other
What volume of water is to be processed?: click arrow
Volumeother:
What is the source of water? : click arrow
ppmother:
What purity of water is desired?: click arrow
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: click arrow
distanceother:
D1How far from the main interconnect to move the product : click arrow
interconnectother:
Height of installation site above water level? : click arrow
heightother:
Where will the return line empty?: click arrow
returnother:
What is source of capitol for construction? : click arrow
capitolother:
energy: click arrow
energyother:
name: Dr.R.Srinivasan
company: Greentech consutancy
address: 50, fourth main rd. R A Puram
state: Madras 600028
country: India
phone: 44 4936057
fax:
email: rsvasan@giasmd01.vsnl.net.in-
webaddress: -
timezone:
B1: Submit
Date: 7/17/99
Time: 5:00:36 AM
Remote Name: 202.54.35.110
Remote User:
HTTP User Agent: Mozilla/4.04 [en] (Win95; U)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/2 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: click arrow
energyother: wind or solar
name: Al-Alawi
company:
address:
state:
country: Oman
phone:
fax:
email: asmalawi@hotmail.com
webaddress:
timezone:
B1: Submit
Date: 7/27/99
Time: 4:26:21 PM
Remote Name: 134.106.66.26
Remote User:
HTTP User Agent: Mozilla/4.6 [en] (Win95; I)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: click arrow
Volumeother: 100 cubic m/day
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: 2000 sq. m
How close to the water source will the plant be placed?: 1/2 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: Ahmed Tawfik
company:
address:
state:
country: Egypt
phone:
fax:
email: amt_ltd1@yahoo.com
webaddress:
timezone: G+2
B1: Submit
Date: 8/6/99
Time: 7:45:57 AM
Remote Name: 209.58.43.87
Remote User:
HTTP User Agent: Mozilla/4.04 [en] (Win95; I)
What is your time line to bring a new system online?
1 year
other
What volume of water is to be processed?: click arrow
Volumeother: 100 cubic m/day
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: 2000 sq. m
How close to the water source will the plant be placed?: 1/2 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: Ahmed Tawfik
company:
address:
state:
country: Egypt
phone:
fax:
email: amt_ltd1@yahoo.com
webaddress:
timezone: G+2
B1: Submit
Date: 8/6/99
Time: 7:46:14 AM
Remote Name: 209.58.43.87
Remote User:
HTTP User Agent: Mozilla/4.04 [en] (Win95; I)
What is your time line to bring a new system online?
1 year
other
What volume of water is to be processed?: click arrow
Volumeother: 30mgd
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother: 7mg/l
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/8 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Co-generation
energyother:
name: g. young
company: ove arup
address: 13 fitzroy street
state: london
country: uk
phone: 00 171 465 2219
fax: 00 171 465 2312
email: gareth.young@arup.com
webaddress:
timezone: gmt
B1: Submit
Date: 8/11/99
Time: 9:10:16 AM
Remote Name: 193.116.20.1
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows NT)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: click arrow
Volumeother: 30mgd
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother: 7mg/l
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/8 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Co-generation
energyother:
name: g. young
company: ove arup
address: 13 fitzroy street
state: london
country: uk
phone: 00 171 465 2219
fax: 00 171 465 2312
email: gareth.young@arup.com
webaddress:
timezone: gmt
B1: Submit
Date: 8/11/99
Time: 9:10:45 AM
Remote Name: 193.116.20.1
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows NT)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: click arrow
Volumeother: 30mgd
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother: 7mg/l
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/8 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Co-generation
energyother:
name: g. young
company: ove arup
address: 13 fitzroy street
state: london
country: uk
phone: 00 171 465 2219
fax: 00 171 465 2312
email: gareth.young@arup.com
webaddress:
timezone: gmt
B1: Submit
Date: 8/11/99
Time: 9:11:05 AM
Remote Name: 193.116.20.1
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows NT)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 16 acre ft/day, 5.2 gallons/day,
20,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : click arrow
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: Stephen Tambourine
company:
address:
state:
country: Kuwait
phone:
fax:
email: st@ngt-kwt.com
webaddress:
timezone:
B1: Submit
Date: 8/14/99
Time: 3:49:27 AM
Remote Name: 195.226.235.216
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98; WinUserMag; DigExt)
What is your time line to bring a new system online?
approx 1 year
other
What volume of water is to be processed?: 8 acre ft/day, 2.6
mil. gallons/day, 10,000 cubic mters/day
Volumeother:
What is the source of water? : brackish water
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/2 mile
distanceother:
D1How far from the main interconnect to move the product : 1/2 mile
interconnectother:
Height of installation site above water level? : 100-200 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Sesto Avolio
company: Eolica s.r.l.
address:
state:
country: Italy
phone:
fax:
email: eolicarm@tin.it
webaddress:
timezone:
B1: Submit
Date: 8/30/99
Time: 10:41:24 AM
Remote Name: 212.216.187.94
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows 98)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 16 acre ft/day, 5.2
gallons/day, 20,000 cubic meters/day
Volumeother:
What is the source of water? : click arrow
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/8 mile
interconnectother:
Height of installation site above water level? : 100-200 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: gas
energyother:
name: k
company:
address:
state:
country: k
phone:
fax:
email: k
webaddress:
timezone:
B1: Submit
Date: 9/29/99
Time: 6:48:15 PM
Remote Name: 132.235.158.45
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: click arrow
Volumeother: 60 - 70 cu. mts. per day
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 100-200 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: Offshore oil & gas installations
How close to the water source will the plant be placed?: click
arrow
distanceother: onboard
D1How far from the main interconnect to move the product : click
arrow
interconnectother: onboard use
Height of installation site above water level? : click arrow
heightother: about 25 mts
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : click arrow
capitolother: Company
energy: electric
energyother:
name: Dr, R.K.Raju
company: Oil & Natural Gas corporation
address: Bandra (E)
state: Maharastrsa
country: India
phone: 6427892
fax:
email: hobgmrbc@hotmail.com
webaddress:
timezone:
B1: Submit
Date: 10/26/99
Time: 5:41:36 AM
Remote Name: 202.54.125.251
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows 98)
What is your time line to bring a new system online?
feasibility evaluation
other
any relative advantages of the system in comparison to RO type systems in terms of capital cost, recurring cost, space requirements, ease of maintenance
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: seifeldin
company: home
address:
state:
country: egypt
phone:
fax:
email: syoussuf@hotmail.com
webaddress:
timezone:
B1: Submit
Date: 11/16/99
Time: 8:39:35 AM
Remote Name: 212.50.96.4
Remote User:
HTTP User Agent: Mozilla/3.01 (Win95; I)
What is your time line to bring a new system online?
no time
zero
other
What volume of water is to be processed?: click arrow
Volumeother: 5 mil.gal/day
What is the source of water? : click arrow
ppmother:
What purity of water is desired?: click arrow
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: click
arrow
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother:
Height of installation site above water level? : click arrow
heightother:
Where will the return line empty?: click arrow
returnother:
What is source of capitol for construction? : click arrow
capitolother:
energy: click arrow
energyother:
name: mohammed
company:
address:
state:
country: 3
phone:
fax:
email: 3
webaddress:
timezone:
B1: Submit
Date: 12/9/99
Time: 6:22:52 PM
Remote Name: 195.226.224.210
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows 98)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/8 mile
interconnectother:
Height of installation site above water level? : click arrow
heightother: -
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Diesel
energyother:
name: Dinesh Sardana
company: Indo Gulf Corporation
address: 312 A, World Trade Centre, New Delhi 1
state: New Delhi
country: INDIA
phone: 0091113311268
fax: 0091113317398
email: igfcc.del@sme.sprintrpg.ems.vsnl.net.in
webaddress: adityabirla.com , indogulf.com
timezone:
B1: Submit
Date: 1/17/00
Time: 12:23:38 AM
Remote Name: 202.144.13.4
Remote User:
HTTP User Agent: Mozilla/4.5 [en] (Win95; I)
What is your time line to bring a new system online?
Immediate
other
We immdediately need to evaluate between Reverse Osmosis & Distilalltion system with due
weigthtages to the Financial implications including capital cost & operational cost
MOST URGENT
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/8 mile
interconnectother:
Height of installation site above water level? : click arrow
heightother: -
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Diesel
energyother:
name: Dinesh Sardana
company: Indo Gulf Corporation
address: 312 A, World Trade Centre, New Delhi 1
state: New Delhi
country: INDIA
phone: 0091113311268
fax: 0091113317398
email: igfcc.del@sme.sprintrpg.ems.vsnl.net.in
webaddress: adityabirla.com , indogulf.com
timezone: +0530 GMT
B1: Submit
Date: 1/17/00
Time: 12:23:54 AM
Remote Name: 202.144.13.4
Remote User:
HTTP User Agent: Mozilla/4.5 [en] (Win95; I)
What is your time line to bring a new system online?
Immediate
other
We immdediately need to evaluate between Reverse Osmosis & Distilalltion system with due
weigthtages to the Financial implications including capital cost & operational cost
MOST URGENT
volume: 4 acre ft/day, 1.3 mil. gallons/day, 5,000 cubic
meters/day
Volumeother:
type: seawater, Reverse Osmosis
ppmother:
purity: 1-100 parts per million
ppmoutother:
D3: 15,000 sq.-ft. min --- 4 acre ft./day plant
T3:
distance: 1/16th mile
distanceother:
D1: 1/16 mile
T1:
height: 0-100 ft
heightother:
return: Return to ocean
returnother:
D2: Private
T2:
energy: electric
energyother:
yes:
no: ON
typeother: municipal water
name: James Malone
company: Missones Del Cabo
address: Cabo San Lucas
state: Baja del Sur
country: Mexico
phone: (916) 797-1421
fax:
email: rajay@concourse.net
webaddress:
timezone: pacific
B1: Submit
Date: 5/6/00
Time: 6:46:58 PM
Remote Name: 209.63.66.35
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows 95)
likesdislikes
reasonforchange
future
4acre ft/day2
replace
timeline
2/3 years
other
What volume of water is to be processed?: click arrow
Volumeother: 10,000 cubic m/day
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 100-200 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother: 20 mile
Height of installation site above water level? : click arrow
heightother: 300 m
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: jw hagendoorn
company: hva
address: wilhelminastraat 146
state:
country: holland
phone: 020-6707734
fax:
email: hagend01@imt.hva.nl
webaddress:
timezone: 8 h
B1: Submit
Date: 5/9/00
Time: 5:55:48 AM
Remote Name: 145.92.18.5
Remote User:
HTTP User Agent: Mozilla/4.04 [nl] (Win95; I ;Nav)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: click arrow
Volumeother: 35 liters per second
What is the source of water? : brackish water
ppmother:
What purity of water is desired?: click arrow
ppmoutother: for irrigation pourpuses
How large of space is available for the installation? : click arrow
space other: open
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother: golf course
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Mauricio Mazari
company: Geología y Servicios
address: Aguascalientes 82-3
state: Roma Sur, D.F.
country: 06760, México, D.F., México
phone: 5252648775
fax: 5252648696
email: mauricio_mazari@infosel.net.mx
webaddress:
timezone: Central USA
B1: Submit
Date: 6/16/00
Time: 2:09:39 PM
Remote Name: 148.246.33.13
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
open
other
volume: 4 acre ft/day, 1.3 mil. gallons/day, 5,000 cubic
meters/day
Volumeother: 2 acreft/day,651,702gal/day,2,466 cubic m/day
type: seawater, Reverse Osmosis
ppmother:
purity: 1-100 parts per million
ppmoutother:
D3: 15,000 sq.-ft. min --- 4 acre ft./day plant
T3:
distance: 1/2 mile
distanceother:
D1: 1/16 mile
T1:
height: 0-100 ft
heightother:
return: Return to ocean
returnother:
D2: Private
T2:
energy: Co-generation
energyother:
yes:
no: ON
typeother:
name: Jeffrey
company:
address:
state:
country: Houston
phone:
fax:
email: senepol@wt.net
webaddress:
timezone:
B1: Submit
Date: 6/22/00
Time: 1:00:52 AM
Remote Name: 205.230.159.47
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.01; MSN 2.5;
Windows 98)
likesdislikes
reasonforchange
I am looking to build a plant.
future
The increse in demand.
replace
timeline
18 months
other
This plant will be built in the Caribbean the(USVI} TO BE EXACT.
What volume of water is to be processed?: click arrow
Volumeother: 4000 cubic metres per day
What is the source of water? : click arrow
ppmother: biologically-treated tannery wastewater
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: 10 acres
How close to the water source will the plant be placed?: click
arrow
distanceother: within the existing plant
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : click arrow
heightother: 330 metres above sea level
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : click arrow
capitolother: private plus government
energy: electric
energyother:
name: N. ABDUR RAHMAN
company: TALCO VANIYAMBADI TANNERS ENVIRO CONTROL SYSTEMS LTD.
address: 183 CUTCHERY ROAD EXTENSION, VALAYAMPET
state: TAMIL NADU
country: INDIA
phone: ++ 91 4174 32392 / 32051
fax: ++ 91 4174 32487
email: VANITEC@VSNL.COM
webaddress:
timezone: +5.50 HOURS GMT
B1: Submit
Date: 6/23/00
Time: 6:25:17 PM
Remote Name: 203.197.155.28
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 95;
provided by VSNL)
What is your time line to bring a new system online?
3 years
other
What volume of water is to be processed?: click arrow
Volumeother: 300,000 GPD
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 300-400 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: 50 ft. x 50 ft.
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: James Malone
company: Misiones
address: 5401 Fenton Way
state: Ca.
country: USA
phone: 916 797-1421
fax:
email: rajaj@concourse.net
webaddress:
timezone: PST
B1: Submit
Date: 7/10/00
Time: 12:15:13 AM
Remote Name: 209.63.66.63
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.01; Windows 95)
What is your time line to bring a new system online?
five years
other
would like a presentation in July
What volume of water is to be processed?: click arrow
Volumeother: 50MCm/YEAR
What is the source of water? : click arrow
ppmother: MEDITERENIAN SEAWATER
What purity of water is desired?: 100-200 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: Please define
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother: BOOT SCHEME TENDER
energy: electric
energyother:
name: Moshe Roth
company: ELCO HOLDINGS Ltd.
address: 21 Shaul Hamelech Blvd. TEL AVIV
state:
country: ISRAEL
phone: 972 3 6939693
fax: 972 3 6939689
email: mroth@trendline.co.il
webaddress: www.elco.co.il
timezone:
B1: Submit
Date: 7/11/00
Time: 9:23:00 AM
Remote Name: 192.117.235.2
Remote User:
HTTP User Agent: Mozilla/4.05 [en] (Win95; I)
What is your time line to bring a new system online?
The shortest posible
other
What volume of water is to be processed?: 16 acre ft/day, 5.2
gallons/day, 20,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: electric
energyother:
name: Kh. Md. Hafizur Rahman
company: NUS
address: Singapore
state: Singapore
country: Singpore
phone: 7743205
fax:
email: hrahman21@hotmail.com
webaddress:
timezone: Singapore
B1: Submit
Date: 7/18/00
Time: 11:24:18 PM
Remote Name: 137.132.2.109
Remote User:
HTTP User Agent: Mozilla/4.61 [en] (Win95; I)
What is your time line to bring a new system online?
10th December, 2000
other
What volume of water is to be processed?: 8 acre ft/day, 2.6
mil. gallons/day, 10,000 cubic mters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/2 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: Avi Genah
company: Chemo Aharon
address: rival 7
state: israel
country: tel aviv
phone: 972-3-6881997
fax: 972-3-6882024
email: genah@hotmail.co.il
webaddress: www.chemo- aharon.com
timezone:
B1: Submit
Date: 7/20/00
Time: 5:50:55 AM
Remote Name: 213.8.11.158
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
other
volume: 4 acre ft/day, 1.3 mil. gallons/day, 5,000 cubic
meters/day
Volumeother: 6 acre ft/day
type: seawater, Reverse Osmosis
ppmother:
purity: 100-200 parts per million
ppmoutother:
D3: 15,000 sq.-ft. min --- 4 acre ft./day plant
T3:
distance: 1/16th mile
distanceother:
D1: 1/16 mile
T1:
height: 0-100 ft
heightother:
return: Return to ocean
returnother:
D2: Government
T2:
energy: Co-generation
energyother:
yes:
no: ON
typeother:
name: Bruce Daniels
company: Soquel Creek Water District
address: P.O. Box 1640, Capitola
state: CA 95010
country: USA
phone: 831-462-4303
fax:
email: Bruce.Daniels@alum.MIT.edu
webaddress:
timezone:
B1: Submit
Date: 12/19/00
Time: 7:17:42 PM
Remote Name: 192.9.25.22
Remote User:
HTTP User Agent: Mozilla/4.75 [en] (Windows NT 5.0; U)
likesdislikes
limited suppy
reasonforchange
supply max'ed out
future
need 2,000 af per year
replace
no, supplement existing system
timeline
3 years
other
What volume of water is to be processed?: click arrow
Volumeother: 5 gallons
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother: drinkable
How large of space is available for the installation? : click arrow
space other: 5by5
How close to the water source will the plant be placed?: click
arrow
distanceother: on site
D1How far from the main interconnect to move the product : click
arrow
interconnectother: 2ft.
Height of installation site above water level? : click arrow
heightother: 1ft.
Where will the return line empty?: click arrow
returnother: bucket
What is source of capitol for construction? : click arrow
capitolother: school
energy: click arrow
energyother: solar
name: Mischon Forehand
company: Benjamin Russell High School
address: 225 Heard Blvd., Alexander City
state: Alabama
country: U.S.
phone:
fax:
email: sbrantley@alex.k12.al.us
webaddress:
timezone:
B1: Submit
Date: 2/14/01
Time: 9:12:39 AM
Remote Name: 216.109.4.2
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
1 week
other
I'm a student working on a class project!!
What volume of water is to be processed?: click arrow
Volumeother: 180,000 cubid m/day
What is the source of water? : click arrow
ppmother: 42,000 ppm
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 3/4 mile
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother: 1/20 mile
Height of installation site above water level? : 100-200 ft
heightother:
Where will the return line empty?: click arrow
returnother: return to sea
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: may ali
company: university of khartoum
address: p.o.box 321
state: hkartoum
country: sudan
phone: 11273495
fax:
email: may_bashir@usa.net
webaddress:
timezone: 1week
B1: Submit
Date: 2/19/01
Time: 4:49:13 AM
Remote Name: 208.7.77.26
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 16 acre ft/day, 5.2
gallons/day, 20,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: unlimited
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Marcel Huber
company:
address:
state:
country: Austria
phone:
fax:
email: marcel.huber@yline.com
webaddress:
timezone:
B1: Submit
Date: 3/30/01
Time: 3:46:27 AM
Remote Name: 62.46.133.251
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
not given yet
other
feasibility study
What volume of water is to be processed?: 8 acre ft/day, 2.6
mil. gallons/day, 10,000 cubic mters/day
Volumeother:
What is the source of water? : click arrow
ppmother: Sea water at 45000 ppm
What purity of water is desired?: 100-200 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: 30,000 sq. m
How close to the water source will the plant be placed?: 1/4 mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: click arrow
returnother: Return to sea
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother: or Diesel
name: Abdallah Sharaf
company: Al-Amoudi Corp.
address: P O Box 2779, Jeddah 21461
state:
country: Saudi Arabia
phone: +966-2-665 8880 Ext. 334
fax: +966-2-660 2792
email: a_sharaf@al-amoudi.com
webaddress:
timezone: GMT + 3.00
B1: Submit
Date: 4/18/01
Time: 11:50:32 AM
Remote Name: 212.138.47.11
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
12-18 months
other
We are also interested in other capacities ( 5 , 15,20) Cubic meters/day. I have recieved earlier email from FP, but needed more info.
What volume of water is to be processed?: 16 acre ft/day, 5.2
gallons/day, 20,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : click arrow
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: MR KARIM
company: KRISTAL AQUA
address: BANDAR SRI DAMANSARA
state: SELANGOR
country: MALAYSIA
phone:
fax:
email: tarbus@time.net.my
webaddress:
timezone:
B1: Submit
Date: 5/4/01
Time: 11:34:56 PM
Remote Name: 161.142.78.84
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows NT;
DigExt)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 100-200 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Donald W. Bell
company:
address:
state:
country: Jamaica
phone:
fax:
email: marbel@n5.com.jm
webaddress:
timezone:
B1: Submit
Date: 5/12/01
Time: 3:28:02 PM
Remote Name: 196.32.5.12
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
1 year
other
photo-voltaics applicable
volume: 4 acre ft/day, 1.3 mil. gallons/day, 5,000 cubic
meters/day
Volumeother:
type: seawater, Reverse Osmosis
ppmother: 35,000 ppm
purity: 1-100 parts per million
ppmoutother:
D3: 15,000 sq.-ft. min --- 4 acre ft./day plant
T3:
distance: 1/16th mile
distanceother:
D1: 1/16 mile
T1:
height: 0-100 ft
heightother: 20 ft
return: Return to ocean
returnother:
D2: Private
T2:
energy: Diesel
energyother:
yes: ON
no:
typeother:
name: Mahmoud Kouatly
company: Arabian Den Est.
address: P.O.Box 6464
state: Riyadh 11442
country: Saudi Arabia
phone: 966 1 472 5861
fax: 966 1 478 2623
email: ardenest@yahoo.com
webaddress:
timezone: GMT +3
B1: Submit
Date: 5/13/01
Time: 1:38:19 PM
Remote Name: 212.138.47.12
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.01; Windows 98;
winusermag39)
likesdislikes
It is clean, efficeint but costly
reasonforchange
cost reduction
future
100,000 m3/day
replace
if water product is cheaper, yes
timeline
12-18 months
other
volume: 4 acre ft/day, 1.3 mil. gallons/day, 5,000 cubic
meters/day
Volumeother:
type: seawater, Reverse Osmosis
ppmother: TDS 35,000 ppm
purity: 1-100 parts per million
ppmoutother:
D3: 15,000 sq.-ft. min --- 4 acre ft./day plant
T3:
distance: 1/16th mile
distanceother:
D1: 1/16 mile
T1:
height: 0-100 ft
heightother: 20 ft
return: Return to ocean
returnother:
D2: Private
T2:
energy: Diesel
energyother:
yes: ON
no:
typeother:
name: Mahmoud Kouatly
company: Arabian Den Est.
address: P.O.Box 6464
state: Riyadh 11442
country: Saudi Arabia
phone: 966 1 472 5861
fax: 966 1 478 2623
email: ardenest@yahoo.com
webaddress:
timezone: GMT +3
B1: Submit
Date: 5/13/01
Time: 1:49:46 PM
Remote Name: 212.138.47.6
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.01; Windows 98;
winusermag39)
likesdislikes
It is clean, efficeint, but costly
reasonforchange
cheaper water production
future
100,000 m3/day
replace
If cheaper, yes
timeline
12-18 months
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/2 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: tommy stevens
company:
address:
state:
country: mexico
phone:
fax:
email: dbholen1@msn.com
webaddress:
timezone:
B1: Submit
Date: 5/31/01
Time: 10:39:12 AM
Remote Name: 209.132.174.230
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.01; Windows 98)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/2 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: tommy stevens
company:
address:
state:
country: mexico
phone:
fax:
email: dbholen1@msn.com
webaddress:
timezone:
B1: Submit
Date: 5/31/01
Time: 10:41:22 AM
Remote Name: 209.132.174.230
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.01; Windows 98)
What is your time line to bring a new system online?
2-5 years
other
What volume of water is to be processed?: click arrow
Volumeother: 20 to 30,000 gal per day
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: John Miller
company: The Islander group
address: box 11614
state: Suva
country: Fiji
phone: 011 679 307 333
fax: 011 679 307 334
email: john@katafanga.com
webaddress: katafanga.com
timezone: 12 + gmt
B1: Submit
Date: 6/3/01
Time: 2:05:40 PM
Remote Name: 202.62.124.46
Remote User:
HTTP User Agent: Mozilla/4.76 [en] (Win98; U)
What is your time line to bring a new system online?
ASAP
other
What volume of water is to be processed?: click arrow
Volumeother: 20 to 30,000 gal per day
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: John Miller
company: The Islander group
address: box 11614
state: Suva
country: Fiji
phone: 011 679 307 333
fax: 011 679 307 334
email: john@katafanga.com
webaddress: katafanga.com
timezone: 12 + gmt
B1: Submit
Date: 6/3/01
Time: 2:06:02 PM
Remote Name: 202.62.124.46
Remote User:
HTTP User Agent: Mozilla/4.76 [en] (Win98; U)
What is your time line to bring a new system online?
ASAP
other
What volume of water is to be processed?: 8 acre ft/day, 2.6
mil. gallons/day, 10,000 cubic mters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Alec Damigos
company:
address:
state:
country: Greece
phone:
fax: 0030-286-24171
email: adamigos@otenet.gr
webaddress:
timezone: +2GMT
B1: Submit
Date: 7/16/01
Time: 10:00:00 AM
Remote Name: 62.103.241.133
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
1 year
other
What volume of water is to be processed?: click arrow
Volumeother: 50 000 cubic meter per day
What is the source of water? : seawater
ppmother: Red Sea specifications
What purity of water is desired?: 100-200 parts per million
ppmoutother: ASTM 0512 and ASTM 0516
How large of space is available for the installation? : click arrow
space other: Any space required
How close to the water source will the plant be placed?: 1/4 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother: might be more
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother: or it could be decided later
What is source of capitol for construction? : Government
capitolother: but it is open for private firms
energy: click arrow
energyother: Energy is not available now but LPG gas is available
name: Babiker Osman Abubaker
company: Nadus Technical Systems Est.
address: P.O.Box 43721 Abudhabi
state: Abudhabi Emirate
country: United Arab Emirates
phone: +97150 6112169
fax: +9712 6676449
email: nadustesy@hotmail.com
webaddress: N/A
timezone: Any Time
B1: Submit
Date: 1/31/02
Time: 11:12:06 AM
Remote Name: 194.170.168.244
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows 98;
Hotbar 2.0)
What is your time line to bring a new system online?
The shortest time possible
other
The National Water Authority of Sudan is facing a weak water infrasstructure at their harbour city (Portsudan)at the Red Sea and they have power energy shortage so they think sea water desalination plant would not be economical. But we conviced them it could be economical with new desalination systems. So they asked us to prpare them proposals on turnkey projects of Design ,Build,Operate and Transfer (DBOT) or Design,Build,Operate and Own (DBOO) terms .So we reckon you could help on that by putting your complete proposal for trunkey project and we could secure other partners and local investors.
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother: 20
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: click arrow
energyother: unsure
name: ron wilson
company: isis town and country
address: po box 100 childers
state: queensland
country: australia
phone: 07 41261600
fax: 07 41261152
email: isistcnews@bigpond.com
webaddress:
timezone: aust east stand
B1: Submit
Date: 5/14/2002
Time: 3:26:57 AM
Remote Name: 210.80.144.35
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
5years
other
interest for newspaper article
What volume of water is to be processed?: 16 acre ft/day, 5.2
gallons/day, 20,000 cubic meters/day
Volumeother: larger is possible
What is the source of water? : seawater
ppmother:
What purity of water is desired?: click arrow
ppmoutother: potable water
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 100-200 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: gas
energyother:
name: LUI S MEJIA
company: MIC
address: PIÑON 9, JARDINES DE SAN MATEO
state: EDO MEX
country: MEXICO
phone: 52 5363 6586
fax: 52 5560 9720
email: mic@prodigy:net:mx
webaddress:
timezone:
B1: Submit
Date: 7/17/2002
Time: 10:57:48 AM
Remote Name: 200.65.174.70
Remote User:
HTTP User Agent: Mozilla/5.0 (Windows; U; Win98; en-US; rv:0.9.4)
Gecko/20011019 Netscape6/6.2
What is your time line to bring a new system online?
PROJECT TO BE DONE IN LEES THA 3 YEARS, ASAP
other
Dear Sir/Madam,
Our company, MIC SA de CV is a mexican company based in México city and we are gathering information for future development of a water desalinisation project within Mexico.
We have looked at many options and we have come to the conclusion based on your information published in your web site, that your process is the most feasible , hence, we are extremely interested to know more about your water desalinisation process.
Could you please send us more information such as:
· Any feasibility study
· Cost of the plant on a turnkey project bases (construction costs & etc)
· Operation & maintenance costs
· Power consumption
· Working life of the plant
· Required infrastructure (i.e. area of the land site )
· Production capacity, largest capacity (cu metre)
· Working hours of the plant (non -stop operation or number of shifts)
· Number of employees for the operation
After analysing the above information we would proceed to arrange a meeting in order to formalised our business relation ship.
Sincerely yours,
Luis Mejia
General Manager
Piñón # 9,
Jardines de san Mateo
Naucalpan Edo Mex
Tel (52) 5563 6586
Fax (52) 5560 9720
What volume of water is to be processed?: click arrow
Volumeother: 20 MGD-30 MGD
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: unknown-you tell us
How close to the water source will the plant be placed?: 1/4 mile
distanceother:
D1How far from the main interconnect to move the product : 1/2 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: click arrow
energyother: electric plus cogen plant nearby
name: Bruce K. colburn
company: EPs Capital Corp.
address: 653 Conestoga Road, Villanova
state: PA
country: USA
phone: 610-525-4438
fax: 610-525-4461
email: bkcolburn@enter.net
webaddress: www.epscapital.com
timezone: Eastern US
B1: Submit
Date: 8/19/2002
Time: 11:28:54 AM
Remote Name: 216.193.184.1
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1)
What is your time line to bring a new system online?
24 months after agreement; probably 3 years from now
other
This will be located in the Caribbean; to be owned by our group
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : brackish water
ppmother:
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Diesel
energyother:
name: Behrouz kawarizadeh
company: columbus micro system inc
address: 5087 westerville rd
state: oh
country: USA
phone: 614-794-1981#24
fax: 614-794-5984
email: behrouz@columbusmicro.com
webaddress: www.columbusmicro.com
timezone:
B1: Submit
Date: 9/26/2002
Time: 9:04:26 PM
Remote Name: 206.222.11.200
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.0)
What is your time line to bring a new system online?
1 to 2 years
other
this project for overseas in Middle East
volume: 4 acre ft/day, 1.3 mil. gallons/day, 5,000 cubic
meters/day
Volumeother:
type: seawater, Reverse Osmosis
ppmother:
purity: 1-100 parts per million
ppmoutother:
D3: 15,000 sq.-ft. min --- 4 acre ft./day plant
T3:
distance: 1/16th mile
distanceother:
D1: 1/16 mile
T1:
height: 0-100 ft
heightother:
return: Return to ocean
returnother:
D2: Private
T2:
energy: Co-generation
energyother:
yes:
no:
typeother:
name: carlos
company:
address:
state:
country: kings
phone:
fax:
email: jcrpratt99@hotmail.com
webaddress:
timezone:
B1: Submit
Date: 10/16/2002
Time: 12:03:32 AM
Remote Name: 24.191.214.55
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.0;
.NET CLR 1.0.3705)
likesdislikes
reasonforchange
future
replace
timeline
other
What volume of water is to be processed?: click arrow
Volumeother:
What is the source of water? : click arrow
ppmother:
What purity of water is desired?: click arrow
ppmoutother:
How large of space is available for the installation? : click arrow
space other:
How close to the water source will the plant be placed?: click
arrow
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother:
Height of installation site above water level? : click arrow
heightother:
Where will the return line empty?: click arrow
returnother:
What is source of capitol for construction? : click arrow
capitolother:
energy: click arrow
energyother:
name: douglas
company:
address:
state:
country: brazil
phone:
fax:
email: surferchick2007@aol.com
webaddress:
timezone:
B1: Submit
Date: 1/24/2003
Time: 11:45:17 AM
Remote Name: 204.100.155.29
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 8 acre ft/day, 2.6
mil. gallons/day, 10,000 cubic mters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 100-200 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/8 mile
distanceother:
D1How far from the main interconnect to move the product : 1/2 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: electric
energyother:
name: David Murray
company: RMIT
address:
state:
country: Australia
phone:
fax:
email: dave@hirise.com.au
webaddress:
timezone:
B1: Submit
Date: 4/5/2003
Time: 11:51:08 PM
Remote Name: 203.2.228.63
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows 98)
What is your time line to bring a new system online?
6 years
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 100-200 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/2 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: hugo tribin
company: Aservin Inc.
address: 7225 N.W. 68th Street, Unit # 8, Miami
state: Florida
country: USA
phone: 305-883-4324
fax: 305-883-4341
email: hugo.tribin@aservin.com
webaddress: www.aservin.com
timezone: Eastern
B1: Submit
Date: 4/30/2003
Time: 10:16:09 AM
Remote Name: 68.158.166.30
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.01; Windows NT
5.0; YComp 5.0.2.4)
What is your time line to bring a new system online?
two years
other
Send us information
What volume of water is to be processed?: click arrow
Volumeother: 240 cubic meter /day
What is the source of water? : click arrow
ppmother: groundwater 11000 mg/l
What purity of water is desired?: click arrow
ppmoutother: 30 ppm
How large of space is available for the installation? : click arrow
space other: 50 sq. meter
How close to the water source will the plant be placed?: click
arrow
distanceother: 50 meter
D1How far from the main interconnect to move the product : click
arrow
interconnectother: 0
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: gas
energyother:
name: Mahmud Tabatabaii
company: Afriz Sazan Toos
address: no.225 Adle8 Adle St.
state: Khorasan
country: Iran
phone: +989135112904
fax: +9851106079620
email: tabatabaii@yahoo.com
webaddress:
timezone:
B1: Submit
Date: 5/20/2003
Time: 2:15:20 AM
Remote Name: 62.217.117.100
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.5; Windows 98; Win
9x 4.90)
What is your time line to bring a new system online?
5 hour
other
What volume of water is to be processed?: 8 acre ft/day, 2.6
mil. gallons/day, 10,000 cubic mters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : click arrow
space other: adequate
How close to the water source will the plant be placed?: 1/4 mile
distanceother:
D1How far from the main interconnect to move the product : 1/4 mile
interconnectother:
Height of installation site above water level? : click arrow
heightother: 33'
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: K.N Prasad
company: Birla Management COrporation Limited, Central
Technical Centre, Baroda
address: Aries House Near siddartha Hotel, Old padra Road, baroda -
15
state: Gujarat
country: India
phone: 91-265-2323546
fax: 91-265-2323521
email: kishanprasad@adityabirla.com
webaddress:
timezone:
B1: Submit
Date: 6/9/2003
Time: 3:42:34 AM
Remote Name: 203.199.109.152
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows 98)
What is your time line to bring a new system online?
1yr
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/4 mile
distanceother:
D1How far from the main interconnect to move the product : 1/4 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: Co-generation
energyother:
name: Tarek Nouh
company: Technical Systems Foundation [tsf]
address:
state:
country: Egypt
phone:
fax:
email: tsf@dataxprs.com.eg
webaddress:
timezone:
B1: Submit
Date: 7/3/2003
Time: 8:22:40 AM
Remote Name: 217.139.172.73
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.1;
Q312461)
What is your time line to bring a new system online?
Next 3-6 months
other
Details needed for consumptions costs, energy and chemicals if any, and any operational and maintenance costs.
What volume of water is to be processed?: 16 acre ft/day, 5.2
gallons/day, 20,000 cubic meters/day
Volumeother: larger if feasible
What is the source of water? : click arrow
ppmother: sea water 36000 ppm
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1 mile
distanceother:
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: P.N.NAGARAJAN
company:
address:
state:
country: INDIA
phone:
fax:
email: nandini@satyam.net.in
webaddress:
timezone: GMT+ 5.5 to 4.5 hours.
B1: Submit
Date: 1/23/2004
Time: 3:34:28 AM
Remote Name: 61.11.52.131
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.0; Windows 98;
DigExt)
What is your time line to bring a new system online?
within 18 months of finalisation.
other
Need budgetary cost estimates with +/- accracy. Also need assessment data on utilities manpower and other infrastructure requirements. Information on operating plants if any with this technology . Comparison with plants using other technologies but within the samr range of capacity in terms of capital costs and recurring operating costs. Special requirements in the specification of feed sea water , if any.
What volume of water is to be processed?: click arrow
Volumeother:
What is the source of water? : seawater
ppmother:
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : click
arrow
interconnectother:
Height of installation site above water level? : click arrow
heightother:
Where will the return line empty?: click arrow
returnother:
What is source of capitol for construction? : click arrow
capitolother:
energy: click arrow
energyother:
name: jim meyer
company:
address:
state:
country: usa
phone:
fax:
email: wolleydog@yahoo.com
webaddress:
timezone:
B1: Submit
Date: 6/22/2004
Time: 6:18:56 PM
Remote Name: 130.212.118.26
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.0)
What is your time line to bring a new system online?
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother: TDS - more than 3500ppm
What purity of water is desired?: 400-500 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other: Area not so important
How close to the water source will the plant be placed?: 1/8 mile
distanceother: part of Power Plant
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 200-300 ft
heightother:
Where will the return line empty?: evaporation ponds
returnother: in some cases to Sea
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Satish Chikodi
company: Green Sol Power Projects (India) Pvt.Ltd
address: T-3,A-Block,Race View Apartment,Cart Track Road,
Vellachery
state: Chennai
country: INDIA
phone: +91-9282119810
fax: +91-44-24354105
email: satish_chikodi@rediffmail.com
webaddress:
timezone:
B1: Submit
Date: 7/30/2004
Time: 10:23:28 AM
Remote Name: 210.210.35.69
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 5.5; Windows NT 5.0;
Creative)
What is your time line to bring a new system online?
At present Iam working on two desalination project in INDIA, and very shortly these projects are to be decided.
other
What volume of water is to be processed?: 4 acre ft/day, 1.3
mil. gallons/day, 5,000 cubic meters/day
Volumeother:
What is the source of water? : brackish water
ppmother:
What purity of water is desired?: 200-300 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000
sq.-ft. min --- 4 acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th
mile
distanceother:
D1How far from the main interconnect to move the product : 1/16
mile
interconnectother:
Height of installation site above water level? : 200-300 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Government
capitolother:
energy: Diesel
energyother:
name: er
company:
address:
state:
country: canada
phone:
fax:
email: rjer@sympatico.ca
webaddress:
timezone:
B1: Submit
Date: 8/22/2004
Time: 11:18:29 PM
Remote Name: 65.95.118.41
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 6.0; Windows NT 5.0)
What is your time line to bring a new system online?
1 year
other
What volume of water is to be processed?: 16 acre ft/day, 5.2 gallons/day, 20,000 cubic meters/day Volumeother: What is the source of water? : seawater ppmother: What purity of water is desired?: 1-100 parts per million ppmoutother: How large of space is available for the installation? : click arrow space other: as requid How close to the water source will the plant be placed?: 1 mile distanceother: D1How far from the main interconnect to move the product : click arrow interconnectother: Height of installation site above water level? : 0-100 ft heightother: Where will the return line empty?: Return to ocean returnother: What is source of capitol for construction? : Private capitolother: energy: Co-generation energyother: also electricity name: Walter H. Foster, III PE, ME, MFGE company: Foster Power Generation, Ltd address: 551 Thorndike Pond Road state: NH country: USA phone: 603-532-7333 fax: 603-532-7297 email: foster@turbines.com webaddress: www.turbines.com timezone: East coast of USA B1: Submit Date: 22 Feb 2005 Time: 08:38:22 Remote Name: 142.167.178.47 Remote User: HTTP User Agent: Mozilla/5.0 (Windows; U; Windows NT 5.0; en-US; rv:1.4) Gecko/20030624 Netscape/7.1 (ax)
What is your time line to bring a new system online?2007, we will be building a 1.2 Gigawatt plant in parrell. This will be the first plant. otherHow much electricity is required per million gallon of water, and how much heat! I would want to maximize my output, maybe not initially but finally. I will have 7,000,000,000 Btu of waste heat per hour. what will be the cost of the equipment per 1 million gallons per day and well as the maintence per million gallons per day
volume: Volumeother: B7O2FKXVp7fmDFk type: ppmother: B7O2FKXVp7fmDFk purity: ppmoutother: B7O2FKXVp7fmDFk D3: T3: B7O2FKXVp7fmDFk distance: distanceother: B7O2FKXVp7fmDFk D1: T1: B7O2FKXVp7fmDFk height: heightother: B7O2FKXVp7fmDFk return: returnother: B7O2FKXVp7fmDFk D2: T2: B7O2FKXVp7fmDFk energy: energyother: B7O2FKXVp7fmDFk yes: no: typeother: B7O2FKXVp7fmDFk name: B7O2FKXVp7fmDFk company: B7O2FKXVp7fmDFk address: B7O2FKXVp7fmDFk state: B7O2FKXVp7fmDFk country: B7O2FKXVp7fmDFk phone: B7O2FKXVp7fmDFk fax: B7O2FKXVp7fmDFk email: dfbfdRRdfg@bestmail.com webaddress: B7O2FKXVp7fmDFk timezone: B7O2FKXVp7fmDFk B1: Date: 14 Jun 2005 Time: 03:13:10 Remote Name: 148.244.150.58 Remote User: HTTP User Agent: Mozilla/4.0
likesdislikesB7O2FKXVp7fmDFk reasonforchangeB7O2FKXVp7fmDFk futureB7O2FKXVp7fmDFk replaceB7O2FKXVp7fmDFk timelineB7O2FKXVp7fmDFk otherB7O2FKXVp7fmDFk
What volume of water is to be processed?: Volumeother: QkOBmBetglEt34r What is the source of water? : ppmother: QkOBmBetglEt34r What purity of water is desired?: ppmoutother: QkOBmBetglEt34r How large of space is available for the installation? : space other: How close to the water source will the plant be placed?: distanceother: QkOBmBetglEt34r D1How far from the main interconnect to move the product : interconnectother: QkOBmBetglEt34r Height of installation site above water level? : heightother: QkOBmBetglEt34r Where will the return line empty?: returnother: QkOBmBetglEt34r What is source of capitol for construction? : capitolother: QkOBmBetglEt34r energy: energyother: QkOBmBetglEt34r name: QkOBmBetglEt34r company: QkOBmBetglEt34r address: QkOBmBetglEt34r state: QkOBmBetglEt34r country: QkOBmBetglEt34r phone: QkOBmBetglEt34r fax: QkOBmBetglEt34r email: dfbfdRRdfg@bestmail.com webaddress: QkOBmBetglEt34r timezone: QkOBmBetglEt34r B1: Date: 14 Jun 2005 Time: 03:15:05 Remote Name: 148.244.150.58 Remote User: HTTP User Agent: Mozilla/4.0
otherQkOBmBetglEt34r
What volume of water is to be processed?: 8 acre ft/day, 2.6 mil. gallons/day, 10,000 cubic mters/day Volumeother: What is the source of water? : seawater ppmothe |