What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : click arrow
ppmother: raw water
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th mile
distanceother: existing pipe
D1How far from the main interconnect to move the product : 1/16 mile
interconnectother: existing pipe
Height of installation site above water level? : click arrow
heightother: at sea level
Where will the return line empty?: Return to river
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: Mr Somchai Chana
company: Thi Olefins Co,, LTD
address: 9, I-4 Rd., Map Ta Phut Industrial Estate
state: Muangrayong, Rayong
country: Thiland
phone: 6638-683400 Ext. 5134
fax: 66386834278
email: Supre_chana@hotmail.com
webaddress:
timezone:
B1: Submit
Date: 10/4/98
Time: 10:35:40 PM
Remote Name: 208.140.5.47
Remote User:
HTTP User Agent: Mozilla/4.0 (compatible; MSIE 4.01; Windows NT)
What is your time line to bring a new system online?
May Be 1 Year
other
Please compare operation costs of your system with the demin.water plant used the same
water source (raw water). 2. as following item 1 I have plan to study your system instead
all of clearified & demin water to recieve from other source (tility company.)

What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : brackish water
ppmother:
What purity of water is desired?: 200-300 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: 1/16th mile
distanceother:
D1How far from the main interconnect to move the product : 1/2 mile
interconnectother:
Height of installation site above water level? : 0-100 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : click arrow
capitolother: gift
energy: gas
energyother:
name: Steve Barilovits
company: Insys Corp
address: 2009 Belvedere Avenue
state: Charlotte, NC 28205
country: USA
phone: 407-306-3319
fax:
email: barilovs@real3d.com
webaddress:
timezone: EDT
B1: Submit
Date: 10/8/98
Time: 8:52:05 AM
Remote Name: 207.15.190.111
Remote User:
HTTP User Agent: Mozilla/3.0Gold (Win95; I)
What is your time line to bring a new system online?
other
Test: Hello Lisa, from Steve Barilovits

What volume of water is to be processed?: 4 acre ft/day, 1.3 mil. gallons/day,
5,000 cubic meters/day
Volumeother:
What is the source of water? : seawater
ppmother: sea water 35000 ppm
What purity of water is desired?: 1-100 parts per million
ppmoutother:
How large of space is available for the installation? : 15,000 sq.-ft. min --- 4
acre ft./day plant
space other:
How close to the water source will the plant be placed?: click arrow
distanceother: 3 miles
D1How far from the main interconnect to move the product : 1 mile
interconnectother:
Height of installation site above water level? : 200-300 ft
heightother:
Where will the return line empty?: Return to ocean
returnother:
What is source of capitol for construction? : Private
capitolother:
energy: electric
energyother:
name: 2000
company: peram m ch prasada rao
address: AIT, Mail box 210, Klong Laung, Pathumthani
state: Thailand 12120
country: desalination
phone:
fax: 66 2 524 7022
email: eva87103@ait.ac.th
webaddress:
timezone:
B1: Submit
Date: 11/4/98
Time: 9:48:57 PM
Remote Name: 203.152.1.114
Remote User:
HTTP User Agent: Mozilla/4.04 [en] (X11; I; OSF1 V4.0 alpha; Nav)
What is your time line to bring a new system online?
2 years
other